↓ Skip to Main Content

Consortium Steel & Iron

CS&I

Main Navigation

  • Home
  • APN Expansion Proposal – CONSORTIUM IRON & STEEL (P4 Branch Line)
Home › 2014

Year: 2014

Additional Electrical work this weekend

By admin Posted on May 19, 2014 Posted in APN Electrical Work

added two new control panels with integrated signals:   new custom RJ45 breakout board at C/MRI connections for new signals:

Rolling Mill #1 Construction underway

By admin Posted on May 8, 2014 Posted in Uncategorized

New Rolling Stock for Steel Mill

By admin Posted on May 2, 2014 Posted in Steel Mill

New approach for DCCOD MB

By admin Posted on April 8, 2014 Posted in APN Electrical Work

Old DCCOD boards were spread out over the layout as pictured below:     New part of the layout Nodes #3 & #4 currently under construction will use a more module  type of scheme as shown below:  

Electrical Work @ APN

By admin Posted on April 8, 2014 Posted in APN Electrical Work

last few months have been wiring New Super maxi Node #3 (fourth node at APN) for CMRI to control P-1 and P-2 detections blocks and Signals.   This is a picture of Node #1

Recent Posts

  • New Modeling tool – ANYCUBIC Photon S 3D Printer
  • BOF Teeming Building assembly Part 1
  • CMRI behind the control panels
  • Summer Project 2016 – Not Steel Mill Modeling Part 4a ( Mother Nature Intervenes )
  • Summer Project 2016 – Not Steel Mill Modeling Part 4

Recent Comments

    Archives

    • January 2020
    • February 2017
    • January 2017
    • August 2016
    • July 2016
    • June 2016
    • December 2015
    • November 2015
    • May 2014
    • April 2014
    • April 2013
    • February 2012
    • December 2011
    • November 2011
    • June 2011
    • May 2011

    Categories

    • 3D Printing
    • APN Electrical Work
    • Laser Cutting
    • Steel Mill
    • Summer Project 2016 – Not Steel Mill Modeling
    • Uncategorized

    Meta

    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    © 2025 | Powered by Responsive Theme