↓ Skip to Main Content

Consortium Steel & Iron

CS&I

Main Navigation

  • Home
  • APN Expansion Proposal – CONSORTIUM IRON & STEEL (P4 Branch Line)

New Rolling Stock for Steel Mill

By admin Posted on May 2, 2014 Posted in Steel Mill

New approach for DCCOD MB

By admin Posted on April 8, 2014 Posted in APN Electrical Work

Old DCCOD boards were spread out over the layout as pictured below:     New part of the layout Nodes #3 & #4 currently under construction will use a more module  type of scheme as shown below:  

Electrical Work @ APN

By admin Posted on April 8, 2014 Posted in APN Electrical Work

last few months have been wiring New Super maxi Node #3 (fourth node at APN) for CMRI to control P-1 and P-2 detections blocks and Signals.   This is a picture of Node #1

C/MRI work 1

By admin Posted on April 13, 2013 Posted in Uncategorized

C.MRI Nodes and other boards   Taping the Screws into board while you fasten the nuts on for soldering… see below

DOE Report on Ironmaking Processes-Oct 2000

By admin Posted on February 7, 2012 Posted in Steel Mill

DOE Report on Ironmaking Processes-Oct 2000

Building Construction 12/2011

By admin Posted on December 8, 2011 Posted in Uncategorized

Coke ovens #1 and The Engine Blower House are under construction as well as Blast Furnace #1 Below are some before and after pics of the Blower Engine House after the base round of painting…. more to come

Model Railroad 75 year DVD

By admin Posted on November 30, 2011 Posted in Uncategorized

My Birthday present from my loving Wife : Model Railroad 75 year DVD set arrived today, and Of course the first search I did was for Steel Mill related articles, this is what I have found so far…. STEEL MILL …

Model Railroad 75 year DVD Read more »

Coke Production For Blast Furnace Ironmaking

By admin Posted on June 7, 2011 Posted in Uncategorized

INTRODUCTION A world class blast furnace operation demands the highest quality of raw materials, operation, and operators. Coke is the most important raw material fed into the blast furnace in terms of its effect on blast furnace operation and hot …

Coke Production For Blast Furnace Ironmaking Read more »

The Basic Oxygen Steelmaking (BOS) Process

By admin Posted on May 14, 2011 Posted in Uncategorized

 INTRODUCTION Accounting for 60% of the world’s total output of crude steel, the Basic Oxygen Steelmaking (BOS) process is the dominant steelmaking technology. In the U.S., that figure is 54% and slowly declining due primarily to the advent of the …

The Basic Oxygen Steelmaking (BOS) Process Read more »

How A Blast Furnace Works

By admin Posted on May 7, 2011 Posted in Steel Mill

How A Blast Furnace Works   The purpose of a blast furnace is to chemically reduce and physically convert iron oxides into liquid iron called “hot metal”. The blast furnace is a huge, steel stack lined with refractory brick, where …

How A Blast Furnace Works Read more »

Posts navigation

Previous 1 2 3

Recent Posts

  • New Modeling tool – ANYCUBIC Photon S 3D Printer
  • BOF Teeming Building assembly Part 1
  • CMRI behind the control panels
  • Summer Project 2016 – Not Steel Mill Modeling Part 4a ( Mother Nature Intervenes )
  • Summer Project 2016 – Not Steel Mill Modeling Part 4

Recent Comments

    Archives

    • January 2020
    • February 2017
    • January 2017
    • August 2016
    • July 2016
    • June 2016
    • December 2015
    • November 2015
    • May 2014
    • April 2014
    • April 2013
    • February 2012
    • December 2011
    • November 2011
    • June 2011
    • May 2011

    Categories

    • 3D Printing
    • APN Electrical Work
    • Laser Cutting
    • Steel Mill
    • Summer Project 2016 – Not Steel Mill Modeling
    • Uncategorized

    Meta

    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    © 2025 | Powered by Responsive Theme